The map contains the 98km DN400/DN500 Bretagne Sud Gas Pipeline (Pleyben – Pluvigner), which starts from the Pleyben Cut-off Station in Châteaulin, Finistère, and ends at the Pluvigner Cut-off Station in Pontivy, Morbihan.
Table of Descriptions
1 Product Details
2 Files Included in This Digital Map
3 Editability of Map
展开剩余77%1 Product Details
Product Name: Map of Bretagne Sud Gas Pipeline (Pleyben – Pluvigner)Nom du Produit: Carte du Gazoduc Bretagne Sud (Pleyben – Pluvigner)Product Type: Vector MapPipeline Length: 98kmCountry: FranceFrom: Châteaulin, Finistère, BretagneTo: Pontivy, Morbihan, BretagneNo. of Cut-off Station: 3No. of Sectioning Station: 3Coordinate Data: Not AvailableFile Formats: Adobe PDF, Adobe IllustratorLifetime Updates: SupportedLanguage: EnglishNote: This digital map is NOT a GIS map or don’t contain coordinate data.
2 Files Included in This Digital Map
[Main Map] Bretagne Sud Gas Pipeline (Pleyben – Pluvigner)
This map includes the geographical area from the pipeline’s starting point to its end point. Its content contains the pipeline route, stations along the pipeline, and the administrative regions that the pipeline passes through.
Two file formats, .pdf and .ai (Adobe Illustrator), are included. Both of them are editable and layered. Users can show and hide a layer simply with a mouse click.
The map consists of following independent layers:
Project Name and LegendNames of Main StationsNames of Sectioning StationsNames of WaterNames of RegionsNames of DepartmentsNames of ArrondissementsNames of CantonsNames of CommunesMain StationsSectioning StationsPipelineBorders of RegionsBorders of DepartmentsBorders of ArrondissementsBorders of CantonsBorders of CommunesBackground Color3 Editability of Map:
Based on the layered digital map (.pdf and .ai)配资操盘开户, users can perform further development and modifications, including but not limited to:
Adjusting the position of text and modifying its attributes such as font, font size, and color;Adjusting the position and size of icon symbols;Modifying the path of oil and gas pipelines to reflect changes caused by rerouting;Adding new pipelines and stations;Changing the border color and line weight of different administrative regions;Modifying the map background color.发布于:上海市文章为作者独立观点,不代表联华证券策略_散户配资_散户配资网观点